New Task Scheduler: Create Tasks

Prev Next

Note

The New Task Scheduler is in beta, so to turn it on for your account, contact FastField Support.

Create a task to send a form to a technician, or leave it unassigned to plan it later. This article covers the New Task screen in the New Task Scheduler, and how to upload many tasks at once from Excel.

How creating a task works

A task is a form you send to someone with instructions, a location, and timing. The New Task screen has 4 steps, and you can move between them in any order:

  • Task Details: the job type, title, form, description, skills, duration, location, and linked resources

  • Scheduling Details: who gets the task, and when it's sent

  • Pre-fill Form: values to fill in on the form before it goes out

  • Notification: the email the recipient gets

The Task Summary and Scheduling Summary on the right show what the task will do. A step with missing required fields shows a red number, so you can see where to look. You can select Create Task from any step.

When you choose a job type, FastField copies its defaults into the task:

  • The form, if you haven't chosen one

  • The description, if it's empty

  • The estimated duration, if it's empty

  • The priority, if none is selected

  • The required skills

You can change any of these on the task. Changing a job type later doesn't change tasks you already created.

Note

Job types, skills, assigning to a group, scheduling a task for later, recurring tasks, and the Schedule view are part of the Pro Plan. On the Core Plan, you can create a task and send it now. Pro features show a Pro badge.

Account admins and users with the Dispatcher role can create tasks. The New Task screen is available when Updated Schedule experience is on in Company Settings.

Open the New Task screen

  1. In the portal, select Tasks > Task List.

  2. Select New Task.

  3. Select New Task again from the menu.

The New Task menu on the Task List, with New Task and Upload Multiple Tasks

You can also open the New Task screen from these places:

  • Schedule view: select Add Task in the Unscheduled Tasks panel. The new task appears in that panel.

  • Tracking map: select a user or an asset on the map, and then select Dispatch. For a user, the task is assigned to them. For an asset, the task is linked to the asset and uses its last known position as the location.

  • Schedule tab of the Task List: select New Schedule to start a task that's sent later

Enter the task details

  1. In Job Type, choose the kind of work, such as AC Repair.

The Job Type list on the Task Details step

The form, description, duration, priority, and required skills fill in from the job type.

  1. Enter a Title, such as No cooling in server room – Cambridge office.

  2. Check the Form. Choose another form if this job needs one.

  3. Check the Description / Instructions. Add any details for this job.

  4. Select a priority: N/A, Low, Medium, or High.

  5. Check the Required Skills. Add or remove skills for this job.

  6. Optional: enter a Project, a Status, a Due Date, and who the task is Requested By.

  7. Check the Estimated Duration. Use the hours and minutes fields to change it.

The Task Details step after choosing the AC Repair job type, with the form, description, priority, duration, and skills filled in

Title, Form, and Description / Instructions are required. The Status list shows only statuses that apply to the chosen form.

Tip

If the job type or skill you need doesn't exist, type its name and select Add a new job type or Add Skill at the bottom of the list. Account admins and users with the Dispatcher role can do this.

Add a location

  1. In Location / Site, start typing the address.

  2. Select the matching address from the list.

To place the location yourself, select Set on map. A location is optional, but the optimizer needs one to plan travel between jobs.

If your account has resource tables, such as assets, sites, or equipment, you can link records to the task. Select + Link Resources, choose a table, and then select the records to link.

Choose who gets the task

  1. Select Scheduling Details.

  2. Choose one of these options in Assign Immediately:

  • Leave Unassigned: the task waits in the unscheduled queue. Assign it from the Schedule view.

  • Assign to User: choose one or more users in User

  • Assign to Group: choose a user group. Any member can pick up the task.

  • Send to External User: enter the email address of someone outside your account

The Assign Immediately options on the Scheduling Details step

Leave Unassigned is selected when the screen opens. To assign a group task to each member separately, select Dispatch individually to each group member. This creates a separate task for every member.

Important

An external user gets a link that opens the form without signing in. Anyone the email is forwarded to can use it.

Tip

When you assign to a user, select Suggest a technician to see who is free, qualified, and closest. Learn more in New Task Scheduler: Suggest a Technician.

The time zone in Times on this task follows the task's address. Dates and times you enter on this step use that time zone. Change it if the customer is somewhere else.

Choose when the task is sent

Choose Now or Schedule. What happens depends on who gets the task:

  • Now with a user, group, or external user: the task is sent when you select Create Task

  • Now with Leave Unassigned: the task goes to the unscheduled queue right away, and nobody is notified

  • Schedule with One-time: the task is sent once, on the Dispatch Date and Time you enter

  • Schedule with Recurring: a new task is sent on a pattern until you stop it

An unassigned task can be scheduled too. It lands in the unscheduled queue when it's sent, and nobody is notified until it's assigned.

A task assigned to Michael Donovan and sent now

Send a task once, later

  1. Select Schedule.

  2. Select One-time.

  3. Enter the Dispatch Date and Time.

A one-time task sent to Michael Donovan on November 2, 2026, at 7:00 AM

Tasks you schedule for later, one-time or recurring, are listed on the Schedule tab of the Task List.

The dispatch date is when the task is sent. The due date on Task Details is when the work has to be finished. To stop recipients from seeing the task before it's sent, select Do not allow recipients to preview task before it's dispatched.

Repeat a task

  1. Select Schedule.

  2. Select Recurring.

  3. Choose a Frequency: Daily, Weekly, Monthly, or Yearly.

  4. Set how often it repeats, and on which days.

  5. Enter when it Starts.

  6. Choose when it Ends: Never, On a specific date, or After a number of occurrences.

A weekly recurring task that starts Monday, November 2, 2026, at 7:00 AM

A recurring task has no due date on Task Details. To give each task a due date, select Give each task a due date.

Note

Suggest a technician isn't available for recurring tasks.

Add time windows

Time windows record when the customer is available or prefers the visit. They are separate from the due date, which is a deadline. The optimizer on the Schedule view uses them to place the task.

  1. On Scheduling Details, turn on Preferred Time Windows.

  2. Choose how strict the windows are:

  • Customer is only available in these windows (Required): the task isn't scheduled at all if no technician is free then

  • Customer prefers these windows, other times are OK (Preferred): the task is scheduled inside a window when possible, and outside it rather than not at all

  1. Add the windows:

  • Weekly Availability: select the days, and then set the hours. Use Weekdays, Weekend, or Every day to select several days at once. Select + Range to add more hours on a day.

  • Specific Date Windows: select + Add Window, and then enter a date, a start time, and an end time

A Preferred time window on Wednesday, November 4, 2026, from 9:00 AM to 12:00 PM

The choice applies to all windows on the task. Customer is only available in these windows is selected by default. A task can have up to 6 specific date windows, and each can be up to 24 hours long.

Tip

Use Required only when the customer really can't be there at other times. A Required window that no technician can meet leaves the task unscheduled.

Pre-fill the form

  1. Select Pre-fill Form.

  2. Fill in anything you already know.

The Pre-fill Form step showing the HVAC Service Report form

The recipient sees these values filled in, and can change them.

Set up the notification

  1. Select Notification.

  2. Choose Send an email or Don't notify.

  3. Check the Subject and Message.

  4. Choose which app links to include: iOS app, Android app, or Web app.

The Notification step, with the subject and message copied from the task

The subject and message start with the task title and description. With Don't notify, the task appears in the recipient's list in the FastField mobile app, but no email or push is sent. An unassigned task notifies nobody. Its settings apply once it's assigned.

Create the task

  1. Check the Task Summary and Scheduling Summary.

  2. Select Create Task.

To leave without saving, select Cancel. There is no draft, so anything you entered is discarded.

Upload multiple tasks

Create many tasks at once from an Excel file.

  1. In the portal, select Tasks > Task List.

  2. Select New Task.

  3. Select Upload Multiple Tasks.

  4. Choose a Form.

  5. Select Sample Excel File to download the template.

  6. Add a row for each task, and save the file as .xlsx.

  7. Upload the file in Excel File.

  8. Select Next, and follow the steps to set up the notification and create the tasks.

The Upload Multiple Tasks panel, with Sample Excel File

The template explains each column. These columns matter most for the New Task Scheduler:

  • Title and Description: required

  • Email: the user who gets the task. Leave it blank to add the task to the unscheduled queue.

  • Duration: optional. The planned duration in whole minutes, from 1 to 1440.

  • Skills: optional. Required skills, separated by semicolons, such as Electrical; Plumbing. Each name must match an active skill.

After the upload, the panel shows how many tasks go to Unassigned, how many are dispatched, and which rows failed and why.

Important

Processing stops at the first empty row. Make sure there are no empty rows between your tasks.

What's next